20x30 Backyard Pool House & Cabana Suite
600 sq ft backyard cabana with wet bar lounge, twin French patio doors, changing bath & exterior-entry pool equipment room
Room Schedule (3 Enclosed Zones)
| Room Name | Clear Interior Span | Clear Area (sq ft) | Floor Finish | GLA Status |
|---|---|---|---|---|
| Cabana Lounge & Wet Bar | 18'-3" x 18'-11" | 346 sq ft | Porcelain Tile | Heated GLA |
| Changing Suite & Bath | 10'-3" x 11'-2" | 115 sq ft | Porcelain Tile | Heated GLA |
| Pool Mechanical & Storage | 10'-3" x 7'-2" | 74 sq ft | Polished Concrete | Non-GLA / Auxiliary |
Doors & Cased Openings (3)
| Opening Type | Clear Width | Qty |
|---|---|---|
French Double Door Paired active/inactive leaves | 6'-0" (72") | 1 |
Single Hinged Door 80" head height, clear swing arc | 2'-8" (32") | 1 |
Single Hinged Door 80" head height, clear swing arc | 3'-0" (36") | 1 |
Windows & Egress Glazing (3)
| Glazing Type | Rough Width | Qty |
|---|---|---|
Standard Architectural Window Double-pane insulated glazing | 5'-0" (60") | 1 |
Standard Architectural Window Double-pane insulated glazing | 4'-0" (48") | 1 |
Standard Architectural Window Double-pane insulated glazing | 2'-6" (30") | 1 |
Kitchen, Bath & Architectural Fixtures (11)
| Mark | Fixture / Cabinet Description | Plan Footprint | Qty |
|---|---|---|---|
| BAR-24 | 24" Beverage Fridge | 24" W x 24" D | 1 |
| BAR-SB30 | 30" Wet Bar Sink | 30" W x 24" D | 1 |
| BAR-B36A | 36" Wet Bar Counter | 36" W x 24" D | 1 |
| BAR-B36B | 36" Serving Counter | 36" W x 24" D | 1 |
| TBL-60 | 60" Patio Table | 60" W x 32" D | 1 |
| SOFA-84 | 84" Cabana Sofa | 84" W x 36" D | 1 |
| VAN-36 | 36" Changing Vanity | 36" W x 21" D | 1 |
| SHW-48 | 48"x36" Pool Shower | 48" W x 36" D | 1 |
| WC-1 | Bath WC | 20" W x 27" D | 1 |
| PMP-01 | Pool Pump & Heater | 28" W x 28" D | 1 |
| STR-48 | Pool Gear Storage | 48" W x 18" D | 1 |
Inspect Real CAD Output Before You Pay
Download our unlocked 34x25 reference ADU specimen files to verify 1/4"=1'-0" vector PDF crispness, 8-layer AutoCAD R12 .DXF fidelity, clean MLS .SVG, and framing takeoff .CSV in your own viewer.
PDF 5-Sheet 1/4"=1'-0" Blueprint (.PDF) DXF 8-Layer AIA AutoCAD R12 (.DXF) SVG Clean White MLS Vector (.SVG) CSV Framing & Drywall Takeoff (.CSV)
$0 Free Draft
Full 2D/3D studio + 1400x1050 watermarked Proof PNG & free 2D/3D share link.
$9 Print Pass (One-Time)
Unwatermarked 2-sheet vector PDF (A-101 + M-101), 2400px PNG, .SVG, unbranded share link & permanent re-edits.
$19 Full CAD Pack (One-Time)
5-sheet 1/4"=1'-0" PDF + 8-layer AutoCAD R12 .DXF + 3D .OBJ + Takeoff .CSV & permanent re-edits (14-day instant refund).
IRC / NKBA Space-Planning Notes & Scope Disclaimer
- Wall Assembly & Framing Basis: Exterior walls are modeled at 6-1/2" overall thickness (2x6 nominal framing at 16" OC plus sheathing/gypsum) and interior partitions at 4-1/2" (2x4 nominal framing plus 1/2" gypsum each side) with a 9'-0" ceiling plate height.
- Wet-Zone Cabana & Exterior Pump Separation: Twin 6'-0" French patio doors and a 5'-0" pass-through bar window open directly to the pool deck, while the 11'-0" x 8'-0" Pool Mechanical & Storage room is separated by an insulated wall with exterior-only access and tracked as Non-GLA.
- IRC R310 Emergency Escape & R311 Circulation: Sleeping rooms incorporate egress glazing sized for >=5.7 sq ft net clear opening (5.0 sq ft at grade-floor openings) with sill height <=44" above finished floor, alongside >=36" clear hallway width.
- ANSI Z765-2021 GLA Separation: Heated above-grade living area is calculated distinctly from unheated garages, mechanical/utility rooms, and detached structures so MLS sheets and preliminary appraisals stay transparent.
Preliminary Space-Planning & CAD Drafting Notice: PlanCaliber is
preliminary space-planning and CAD drafting software, not a licensed architectural or
structural engineering firm. All templates, takeoff quantities, and exported sheets are for
design planning, estimating, and contractor coordination. Verify all site dimensions, soil
and structural load paths, header sizing, egress openings, and local building code
amendments with a licensed professional and your local building department prior to
construction.